E: info@deltapanels.com      Head Office: 731 Boundary Road, Richlands, Qld 4077    +61 7 3271 2170
 W: www.deltapanels.com     Sydney Depot:  11 The Old Northern Road, Narellan, NSW 2567   +61 2 4611 7712
ABN: 11 147 861 292
Version Date: 
2025-11-25
56
STEP 6        CALCULATE THE UPLIFT ON THE POSTS
Step 6.2       Calculate the Uplift
Uplift on the Post (kN) = Uplift on the Beam (kN/m) x Load Width of the Post (metres).
UPLIFT LOADS ON THE BEAM (kN/m) - CYCLONIC
Wind Category
Load Width (mm)
TYPE 1
TYPE 2
TYPE 3
TYPE 4
C1
(W50)
1500
1.43
2.70
3.24
4.86
1800
1.72
3.24
3.89
5.83
2100
2.00
3.78
4.54
6.80
2400
2.29
4.32
5.19
7.78
2700
2.57
4.86
5.83
8.75
3000
2.86
5.40
6.48
9.72
3300
3.14
5.94
7.13
10.69
3600
4.43
6.48
7.78
11.67
3900
3.71
7.01
8.42
12.64
4200
4.00
7.56
9.07
13.61
4500
4.28
8.10
9.72
14.58
4800
4.57
8.64
10.37
15.55
5100
4.86
9.18
11.02
16.52
5400
5.29
9.99
11.99
17.98
6000
5.71
10.80
12.96
19.44
C2
(W51)
1500
2.13
4.01
4.82
7.23
1800
2.56
4.83
5.79
8.68
2100
2.98
5.63
6.75
10.13
2400
3.41
6.43
7.72
11.58
2700
3.83
7.23
8.68
13.02
3000
4.26
8.04
9.65
14.47
3300
4.68
8.84
10.61
15.91
3600
5.11
9.65
11.58
17.36
3900
5.53
10.45
12.54
18.81
4200
5.96
11.26
13.52
20.26
4500
6.38
12.06
14.47
21.70
4800
6.81
12.86
14.44
23.15
5100
7.23
13.66
16.40
24.59
C3
(W74)
1500
3.13
5.91
7.10
10.65
1800
3.76
7.10
8.52
12.78
2100
4.38
8.28
9.94
14.90
2400
5.01
9.47
11.36
17.03
2700
5.63
10.65
12.77
19.16
3000
6.26
11.83
14.19
21.29
3300
6.88
13.01
15.61
23.42
3600
7.51
14.19
17.03
25.55
3900
8.13
15.38
18.45
27.68
4200
8.76
16.56
19.87
29.81

View this content as a flipbook by clicking here.