E: info@deltapanels.com Head Office: 731 Boundary Road, Richlands, Qld 4077 +61 7 3271 2170 W: www.deltapanels.com Sydney Depot: 11 The Old Northern Road, Narellan, NSW 2567 +61 2 4611 7712 ABN: 11 147 861 292 Version Date: 2025-11-25 54 MULTI-SPAN Figure A13 Load Width - Post 1 = Half (0.5) of “A” metres + “C” meters Load Width - Post 2 = Half (0.5) of “A” metres + “D” meters Load Width - Post 1 = Half (0.5) of “A” metres + “C” meters Load Width - Post 2 = Half (0.5) of “A” metres + Half (0.5) “B” meters Load Width - Post 3 = Half (0.5) of “B” metres + “D” meters STEP 6 CALCULATE THE UPLIFT ON THE POSTS Step 6.1 Select the Load Width on each Post, refer to the diagram below: SINGLE-SPAN Figure A12
View this content as a flipbook by clicking here.