E: info@deltapanels.com    W: www.deltapanels.com
Head Office: 731 Boundary Road, Richlands, Qld 4077  |  P: +61 7 3271 2170  
Sydney Depot: 11 The Old Northern Road, Narellan, NSW 2567  |  P: +61 2 4611 7712
ABN: 11 147 861 292
   Page: 18 of 126
Version Date: 2025-12-29
8.4 - Remove Underneath  
       Protective Film
Turn the panel over on the trestles and 
remove any left over insulation core  
from the gutter cutback end of the 
panel to a depth of at least 30mm. 
8.5 - Remove Plastic Film
Peel back the clear plastic protective 
coating from the underside/ceiling face 
of the panel approximately 100mm at top 
end to fit into the receiver channel. Peel 
back sufficient clear plastic protective 
coating to clear supporting beam at 
the gutter end. Clear plastic protective 
coating should be completely removed 
from each panel after each panel is 
fitted.
8.6 - Turn Down
Turn the panel back over and turn 
down all roof pans at the gutter end 
approximately 20° using Turn-Up/Turn-
Down Tool or Vice-grips.
8. INSTALLATION - PANEL PREPARATION

View this content as a flipbook by clicking here.