E: info@deltapanels.com    W: www.deltapanels.com
Head Office: 731 Boundary Road, Richlands, Qld 4077  |  P: +61 7 3271 2170  
Sydney Depot: 11 The Old Northern Road, Narellan, NSW 2567  |  P: +61 2 4611 7712
ABN: 11 147 861 292
   Page: 17 of 126
Version Date: 2025-12-29
It is essential that the ends of the panels are properly treated for weather proof 
protection. That is, they are either turned up (at the receiver channel or ridge cap 
end) and turned down (at the gutter fascia end).
8.1 - Prepare Ends
Run a sharp knife or box cutter between 
the roof panel and the insulation core 
to cut the glue bond. You will need to 
go to a depth of at least 30mm. 
8.2 - Turn up End
Turn up all roof pans at the top end 
of the panel to full rib height using 
your Turn-up/Turn-down Tool or Wide 
Mouth Vice-grips as illustrated. 
8.3 - Trim Overlap
Trim both the overlay rib at the top 
end and the underlay rib at the gutter 
end using tin snips. This is to allow the 
panel to lap properly once turned up at 
the top end and to stop capillary action 
drawing water back along the underlay 
leg at the gutter end. 
8. INSTALLATION - PANEL PREPARATION

View this content as a flipbook by clicking here.