E: info@deltapanels.com    W: www.deltapanels.com
Head Office: 731 Boundary Road, Richlands, Qld 4077  |  P: +61 7 3271 2170  
Sydney Depot: 11 The Old Northern Road, Narellan, NSW 2567  |  P: +61 2 4611 7712
ABN: 11 147 861 292
   Page: 13 of 126
Version Date: 2025-12-29
5. DELIVERY RECEIVALS & STORAGE
•	
For longer packs the panel packs will need to be craned off the delivery vehicle 
with slings and a spreader bar. 
•	
If the panels exceed 8 meters a spreader bar is required to ensure that the 
slings do not cause any damage to the packs.
•	
The packs of panels should be stored correctly on the site in an area that will 
eliminate any chance of damage occurring to the packs
•	
Packs of MW panels must be stored to ensure the panels do not get wet. The 
factory applied protective wrapping may not be adequate to ensure the panels 
remain completely dry so additional protection should be used, preferably store 
the panels indoors.
•	
The Delivery Docket will clearly state the quantity, description and type of panels 
delivered along with any associated components. It is the owners responsibly to 
cross check the delivery docket with the actual goods received at the time the 
goods are received.
Onsite Storage
•	
The panels should not be unpacked until it is time to install them, in the meantime 
they should be stored in an area away from traffic to eliminate the possibility of 
damage.
•	
Panels exposed to direct sunlight can result in Thermal Bowing which can 
prevent proper engagement during installation. Store the panels in a shaded 
area or leave the panels fully packaged until required for installation.
•	
All protective packaging when removed should be disposed of correctly
•	
Be aware that there is protective film on the steel surfaces, of the panels if this 
film is left exposed to sunlight for a period of time it may become difficult to 
remove. It is advised to keep the original packaging shroud over the top of the 
panel packs to eliminate sun exposure
•	
Keep panels a safe distance from other on site trades that are welding, cutting 
or painting.
•	
No other materials are to be stored or stacked on top of the panel pack.

View this content as a flipbook by clicking here.