E: info@deltapanels.com W: www.deltapanels.com Head Office: 731 Boundary Road, Richlands, Qld 4077 | P: +61 7 3271 2170 Sydney Depot: 11 The Old Northern Road, Narellan, NSW 2567 | P: +61 02 4611 7712 ABN: 11 147 861 292 Page: 10 of 76 Version Date: 2025-12-30 7. DELIVERY RECEIVALS & STORAGE Receiving Panel Packs • The panels are carefully packed to protect them during transport. • They are a ready-to-install, finished product and special care should be taken when unloading and handling them to avoid permanent damage to the panels. Particularly the underside ceiling. • Ensure that adequate lifting equipment (ie crane or forklift) is available prior to the delivery truck arriving • Ensure that a suitable level location is available to store the off-loaded panels in. • When unloading the truck, the packs of panels will have attached stickers indicating the correct lifting points. • For packs of panels under 8 meters a forklift may be used. • For longer packs a forklift with spreader lifting lugs is recommended.
View this content as a flipbook by clicking here.