Delta Panels Pty Ltd Delta Panels - Panel testing to FP1.4 and 4284 Test Report AS_NZS 4284 30B-20-0134-TRP-16554-0 30 July 2021 Page 3 of 11 Executive Summary Testing on Delta Panels Pty Ltd (The client) Insulated panel wall system test sample was carried out at Vipac Engineers and Scientists’ (Vipac) Port Melbourne facility. The sample was prepared by the client (the installer) and installed in the rig and tested by Vipac in June 2020. Testing was undertaken to AS/NZS 4284:2008 for the below building pressures: Table 1: Target Building Pressures Serviceability Pressure +1634 Pa -2450 Pa The test sample was found to have the below results for AS/NZS 4284:2008 compliance: Table 2: Summary of results Test Date AS/NZS 4284:2008 Test Results 02/06/2021 Clause 8.2 – Preliminary tests Complies 02/06/2021 Clause 8.4 - Air infiltration test Complies 11/06/2021 Clause 8.5 – Static water test Complies 11/06/2021 Clause 8.6 - Cyclic water test Complies Full details are contained within the report.
View this content as a flipbook by clicking here.