Delta Panels Pty Ltd - ABN: 11 147 861 292 P: +61 07 3271 2170 E: info@deltapanels.com W: www.deltapanels.com Head Office: 731 Boundary Road, Richlands, Qld 4077 Sydney Depot: 11 The Northern Road, Narellan, NSW. 2567 Page 5 of 8 Version Date: 2025-10-15 STEP 1 - DETERMINE THE WIRING LAYOUT RECOMMENDED INSTALLATION STEPS INTO AN INSULATED STRUCTURAL PANEL STEP 2 - ENSURE POWER IS DISCONNECTED • Ensure that there is no live power in the work area, especially where the recess holes are going to be cut. • Make sure that the power supply is switched off to the GPO which will power the Led Driver. • The downlights must be installed in the middle third of the width of the panel. • Downlights should only be installed no closer than every second panel. • The roof must be non trafficable (designed with only the 1.1kN maintenance load). • The downlights must be no closer that 2000mm along the span of the panel.
View this content as a flipbook by clicking here.